Galiano Estates presents the Onyx residential complex in the Malinovа Dolina district. The complex will be built on its own plot IV-6014 with an area of 2047 sq.m., reg. quarter 78, Malinovа Dolina locality-1st, 2nd, 3rd, 4th, 5th, 6th part, Studentski district, Zone Zhм (residential construction) with indicators: Kint 1.3; building density max. 40%; greening-min. 40%; cornice height -10 meters. De facto with the projects we reach: built-up area above ground 2660.29 m2; built-up area basement -1305m2; total built-up area of the building above ground and underground -3 965 m2; building density 37.55%; greening density 46.9%.
Positioned under the Ring Road - South Arc /north of the Ring Road, west of Todor Nedkov St/;
Near two future metro stations - NSA and Ring Mall; Near the Ring Road - South Arc,
Simeonovsko shose Blvd., Kliment Ohridski Blvd.; to the future extension of Edward Genov Blvd.; Students' town,
Ring Mall, Ikea, Lift of Simeonovo, etc.
This southern area is in a communicative location, in a completely new residential neighborhood, with completely new infrastructure – roads, alleys, water and sewage, electricity network, etc., with a lot of greenery, a low building coefficient for each of the plots (KINT=1.3), with a low height of all buildings – cornice up to 10 meters (four-story), without connected construction (without party walls), i.e. all buildings are freestanding. This implies air, light, views, and space for every home in the neighborhood.
Apartments: 32 (16 two-room and 16 three-room)
Underground garages: 28
Underground parking spaces: 7
Outdoor parking spaces 4
Underground warehouses (basements): 17
We present to you Apartment A 20 on the third residential floor out of a total of four. The apartment consists of a living room with a kitchen, a bedroom, a bathroom with a toilet, and a terrace.
PRICES AND PAYMENT PLANS:
-1500 EUR/sq.m. with a payment scheme: 80% advance payment upon preliminary contract + 20% upon Act 16 and notary deed;
-1550 EUR/sq.m. with a payment scheme: 50% advance payment upon preliminary contract + 20% upon Act 14 + 20% upon Act 15 + 10% upon Act 16 and title deed;
-1600 EUR/sq.m. with a payment scheme: 30% advance on the preliminary contract + 30% on Act 14 + 20% on Act 15 + 20% on Act 16 and the title deed;
-1650 EUR/sq.m. with a payment scheme: 20% upon preliminary contract + 20% upon Act 14 + 30% upon Act 15 + 30% upon Act 16 and the notarial deed;
-1750 EUR/sq.m with a payment scheme: 20% on a preliminary contract + 80% on Act 16 and the title deed;
-Private yard for ground floor apartments - 300 euro/sq.m.
Garages - 26000 euro/piece;
Parking spaces - 23000 euro/piece;
Warehouses/basements - 6000 euro/piece
It is delivered with plaster and screed. Each apartment is equipped with a centralized air conditioning system providing high comfort and energy efficiency.
Fixed price, no changes!
WITH A BUILDING PERMIT, ENTERED INTO FORCE. Construction started - April 2024. Permission to use /Act 16/ - June 2026.
Offer 4246
Compare listings
Compare